USACE Mouth of Colorado Maintenance Dredging with Sargent Beach, Beneficial Use, Breakwaters, and Beach Placement, Matagorda County, Texas

KazakhTenders notice for USACE Mouth of Colorado Maintenance Dredging with Sargent Beach, Beneficial Use, Breakwaters, and Beach Placement, Matagorda County, Texas. The reference ID of the tender is 120279233 and it is closing on 21 Jul 2025.

100% Secure Payments

Tender Details

  • Country: USA
  • Summary: USACE Mouth of Colorado Maintenance Dredging with Sargent Beach, Beneficial Use, Breakwaters, and Beach Placement, Matagorda County, Texas
  • KZT Ref No: 120279233
  • Deadline: 21 Jul 2025
  • Competition: ICB
  • Financier: Self Financed
  • Purchaser Ownership: Public
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: W912HY25RA001
  • Purchaser's Detail :
  • Purchaser : DEPT OF DEFENSE | DEPT OF THE ARMY
    KO CONTRACTING DIVISION 2000 FORT POINT ROAD, GALVESTON , TX 77550-1229, USA
    Primary Point of Contact: Christy Slater, christy.l.slater@usace.army.mil, Phone Number 4097666343
    Secondary Point of Contact: Curtis Cole, Jr., curtis.cole@usace.ar...
    Email :christy.l.slater@usace.army.mil

  • Description :
  • Description
    Schedule 1 - Project is for Shallow Draft Maintenance Pipeline Dredging of the Mouth of Colorado Entrance Jetty Channel and Detention Basin and will include varying advanced maintenance and 2- over-depth. Schedule 1 includes dredging of approximately 876,000 cubic yards (CY). Material will be placed west of West/South Jetty in nearshore zone; Construction of Terminal Groin and 4 of the 5 planned nearshore breakwaters at Sargent Beach, 25 miles East of the Mouth of Colorado. Estimated duration is 490 calendar days. Option 1 includes Beneficial Use beach placement of dredged material along the breakwater beach area of Sargent Beach, 25 miles East of the Mouth of the Colorado. Additional time of 40 calendar days. Option 2 includes Beneficial Use placement of dredged material along Sargent Beach-s historic stretch area, 25 miles East of the Mouth of the Colorado. Additional time of 10 calendar days. Option 3 includes construction of the 5th nearshore breakwater with the planned construction of the four (4) nearshore breakwaters aligned with the West coastline of Sargent Beach. Additional time of 30 calendar days.
  • Documents :
  •  Tender Notice

    Pre-solicitation-Synopsis_25RA001_June-2025.pdf

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
KazakhTenders Features

KazakhTenders Features

Fresh and verified Tenders from Kazakh. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Invalid Captcha !

Get FREE SAMPLE TENDERS from Kazakh in your email inbox.

  Chat with us